So I got delayed a touch with study and other boring things like that, so this week there has been a big push on getting some work done.
As you can see, still lots to go. The rest of the batts will be done this week. From then the GIB should be getting done in wall stage in the next few weeks.
I also got a rack put together as you can see in the last photo, each rack should be good to hold 10 600x300x300 tank and I have two. They fit into the a very small space in the corner by the door frame and the window, so that leaves me with heaps of room for bigger tanks.
A new window should be ready to fit in two weeks so the existing ones will be fully removed and that will replace it with the heating unit I got from Caryl, what feels like a decade ago now.
Lock smith is due on Saturday, so I will seal up the extra door and complete the batts on that wall then.